• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.18.2007.tde-28032007-134003
Documento
Autor
Nombre completo
Sulita Mendes Pierotti
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Carlos, 2007
Director
Tribunal
Povinelli, Jurandyr (Presidente)
Daniel, Luiz Antonio
Kellner, Erich
Título en portugués
Avaliação da partida de reator anaeróbio de fluxo ascendente e manta de lodo (UASB), em escala real, sob condições hidráulicas desfavoráveis
Palabras clave en portugués
Digestão de lodo aeróbio
ETE
Partida de UASB
Sobrecarga hidráulica
Resumen en portugués
Este estudo teve como objetivo avaliar a partida de reator anaeróbio de fluxo ascendente e manta de lodo (UASB), em escala real, no tratamento de esgoto sanitário, sob condições hidráulicas desfavoráveis. O reator UASB faz parte do sistema de tratamento da ETE Água Vermelha, e é seguido de um biofiltro aerado submerso e de uma unidade de desinfecção por ultravioleta. Foi utilizado metade do volume do reator (117 'M POT.3'), possibilitando menor tempo de detenção hidráulica (TDH). A pesquisa foi dividida em duas fases, uma sem a adição de inóculo (fase I) e outra com inoculação (fase II). Na fase I, foram aplicados vazão de 480 'M POT.3'/dia e carga orgânica volumétrica (COV) de 1,74 kgDQO/'M POT.3'.dia com TDH de 6 horas. Para a fase II, estes valores foram de 600 'M POT.3'/dia, 2,88 kgDQO/'M POT.3'.dia e 5 horas. Os resultados mostraram que as excessivas velocidades ascensionais não permitiram que o reator tivesse desempenho satisfatório. Ocorreu remoção de matéria orgânica e sólidos suspensos apenas na fase II, com exceção dos sólidos suspensos voláteis, que apresentaram remoção nas duas fases. Os lançamentos indevidos de lodo de fossas à que a ETE está submetida, provocaram aumento de sólidos dissolvidos e alcalinidade no efluente. Os leitos de lodo formados nas fases I e II possuíam concentrações semelhantes de sólidos, porém o segundo apresentou maior eficiência de tratamento. Na fase I a remoção de matéria orgânica foi pequena e não ocorreu a formação da manta de lodo. Na fase II ocorreu o provável início da estabilização do processo, aproximadamente 60 dias após a inoculação, a partir de quando a remoção de matéria orgânica dissolvida foi considerada constante e foi observada a formação da manta de lodo. O descarte de 8,5 'M POT.3' de lodo pode ser feito a cada 30 dias.
Título en inglés
Start-up of a full-scale upflow anaerobic sludge blanket (UASB) reactor, treating domestic sewage, under unfavorable hydraulic conditions
Palabras clave en inglés
Aerobic sludge digestion
Hydraulic overload
UASB's start-up
WWTP
Resumen en inglés
The objective of this study was to evaluate the start-up of a full-scale upflow anaerobic sludge blanket (UASB) reactor, treating domestic sewage, under unfavorable hydraulic conditions. The UASB reactor is part of the wastewater treatment plant of Água Vermelha (São Carlos, SP, Brazil), and it is followed by a submerged aerated biofilter and an ultraviolet radiation disinfection unit. Half of the reactor volume was used (117 'M POT.3'), making it possible to work with a low hydraulic retention time (HRT). The research was divided in two phases, one without reactor seeding (phase I), and another when the reactor was seeded (phase II). At phase I, a flow rate of 480 'M POT.3'/d and a volumetric loading rate of 1,74 kgDQO/'M POT.3'.d were applied, with 6 hours of HRT. At phase II, this values were 600 'M POT.3'/d; 2,88 kgDQO/'M POT.3'd and 5 hours. The results showed that excessive upflow velocities prevented satisfactory performance of the reactor. Removal efficiencies of COD, BOD and TSS were obtained only in phase II, except for VSS, which showed removal in both stages. Unauthorized inputs of septic tanks sludge caused increase in dissolved solids and alkalinity in the effluent. The sludge beds obtained in phases I and II had similar solids concentration; however, the second presented better treatment efficiency. At phase I, organic matter removal efficiency was low and the blanket sludge was not observed. At phase II, the process likely stabilized 60 days after inoculation (operations' day 240). From then on, dissolved organic matter digestion was constant and the sludge blanket was observed. The removal of the excess sludge can be done every other 30 days.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
SulitaPierotti.pdf (3.44 Mbytes)
Fecha de Publicación
2007-04-17
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.