Disertación de Maestría
DOI
https://doi.org/10.11606/D.18.2019.tde-13062019-102723
Documento
Autor
Nombre completo
Caio Paziani Tomazella
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Carlos, 2019
Director
Tribunal
Nagano, Marcelo Seido (Presidente)
Ribeiro, José Francisco Ferreira
Tavares Neto, Roberto Fernandes
Título en portugués
Novos limitantes inferiores para o método branch-and-bound na solução de problemas flowshop permutacional
Palabras clave en portugués
branch-and-bound
flowshop permutacional
scheduling
setup dependente da sequência
atraso total
tempo de fluxo total
Resumen en portugués
Em um contexto industrial, a programação da produção tem como objetivo alocar recursos para operações de forma a aumentar a eficiência operacional do processo de fabricação. Esta programação pode ser modelada na forma de problemas de sequenciamento de tarefas, que são resolvidos visando minimizar um determinado critério de desempenho. A aplicação de métodos exatos nestes problemas possibilita encontrar a solução ótima, tanto para aplicação direta como para a validação de métodos heurísticos e metaheurísticas. Entretanto, a literatura mostra que os métodos exatos, tanto a resolução do problema pela modelagem em programação linear-inteira mista como o branch-and-bound, têm sua aplicação restrita à problemas de menores tamanhos. O objetivo deste trabalho é propor novas formulações de limitantes inferiores para a aplicação do branch-and-bound em problemas de flowshop permutacional visando aumentar sua eficiência e aplicabilidade. Os limitantes propostos são avaliados em problemas de flowshop permutacional com tempos de setup dependente da sequência, tendo como critérios de desempenho o tempo de fluxo total e o atraso total. A avaliação da aplicabilidade de cada limitante é feita através do número de nós explorados e o tempo computacional gasto pelo branch-and-bound para resolver problemas de diversos tamanhos.
Título en inglés
New lower bounds for the branch-and-bound method for solving permutation flowshop problems
Palabras clave en inglés
branch-and-bound
permutation flowshop
scheduling
sequence dependent setup times
total flow time
total tardiness
Resumen en inglés
In an industrial context, production sequencing aims at allocating resources for job processing while increasing manufacturing efficiency. This task can be modelled in the form of scheduling problems, which are solved by minimizing a pre-determined performance criterion. The use of exact methods allows the optimal solution to be found, which can be applied directly in the manufacturing shop or used to validate heuristic and metaheuristic methods. However, the literature shows that MILP and branch-and-bound, both exact methods, are restrained to small-sized scheduling problems. The aim of this project is to propose new lower bound formulations to be used in the branch-and-bound method for permutational flowshop probems, in order to extend its efficiency and applicability. The proposed bounds are tested in permutational flowshop problems with sequence dependent setup times, and using as performance criteria the total flow time and the total tardiness. The evaluation of each lower bounds applicability is done considering the number of explored nodes and the required computational time for the branch-and-bound to solve problem instances of different sizes.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2019-06-26
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.