• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2019.tde-08032019-114508
Document
Auteur
Nom complet
Rafael Barroso Queiroz
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2018
Directeur
Jury
Marin, Tatiane (Président)
Lima, Hernani Mota de
Torres, Vidal Félix Navarro
Titre en portugais
Diminuição do tempo em manutenção preventiva em uma frota de caminhões de uma mineração de grande porte: uma discussão baseada na manutenção produtiva total.
Mots-clés en portugais
Gestão de ativos
Gestão integrada
Manutenção preventiva
Manutenção produtiva total (MPT)
Resumé en portugais
Por estar diretamente sujeita a fatores econômicos de nível global, a mineração tende a se desenvolver para buscar processos produtivos mais enxutos, aliando menores custos operacionais a melhores taxas produtivas. Neste contexto, o objetivo principal deste trabalho é avaliar o comportamento geral da curva de tempo em manutenção preventiva de uma frota de caminhões em uma mineração de grande porte, sendo a análise realizada em uma janela temporal baseada em um período econômico de mínimo local nos preços do cobre. A partir do comportamento observado é feita uma discussão sob as premissas da metodologia de gestão nomeada Manutenção Produtiva Total de forma a se debater os possíveis principais riscos e/ou consequências que podem ser enfrentadas pelo projeto e como estas decisões qualitativamente indicam o grau de maturidade na integração operacional entre produção e manutenção em um projeto minerário. Ao final, pode-se concluir que ainda é necessário um intenso trabalho em se traduzir as premissas da MPT para a indústria mineral, buscando-se adaptar processos e métricas que sejam mais condizentes ao ambiente da indústria extrativa (que é muito diferente da indústria de manufatura, onde o programa teve início). Além disso, fica claro que a aplicação da MPT é possível e bem-vinda na mineração já havendo de vários estudos acadêmicos na área - ou seja, o ponto em questão mais desafiador provavelmente é que seja desenvolvido um programa de MPT de forma endógena em um projeto mineral.
Titre en anglais
Decreasing in time of preventive maintenance of a transportation fleet in a large-scale mine: a discussion based on total productive maintenance.
Mots-clés en anglais
Asset management
Integrated management
Preventive maintenance
Total productive maintenance (TPM)
Resumé en anglais
As it is directly under global economic factors, the mining industry tends to develop to seek leaner production processes, combining lower operational costs to better productive rates. In this context, the main objective of this study is to evaluate the general behavior of the time spend in preventive maintenance of a truck fleet from a large-scale mining project, being the analysis performed in a time window based on an economic period of local minimum in copper prices. From the observed behavior a discussion is made under the assumptions of the management methodology named Total Productive Maintenance in order to discuss the possible main risks and/or consequences that can be faced by the project and how these decisions qualitatively indicate the degree of maturity between production and maintenance in a mining project. In the end, it can be concluded that an intense work is still needed to translate the TPM premises into the mineral industry, being necessary to seek ways to adapt processes and metrics that are more suited to the extractive industry environment (which is very different from the manufacturing industry, where the program started). In addition, it is clear that the application of TPM is possible and welcome in mining since there are several academic studies in the area - in other words, the most challenging point in question is probably that an endogenous TPM program is developed within a mineral project.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2019-03-12
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.