• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2008.tde-10112009-102642
Documento
Autor
Nombre completo
Fernando Cesar Dias Ribeiro
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2008
Director
Tribunal
Paciléo Netto, Nicola (Presidente)
Fonseca Júnior, Edvaldo Simões da
Veiga, Luís Augusto Koenig
Título en portugués
Proposta de metodologia para verificação da estabilidade dos pilares de redes para monitoramento geodésico de barragens - estudo de caso.
Palabras clave en portugués
Barragens (segurança; monitoramento)
Geodésia (instrumentos)
Sistema de posicionamento global
Resumen en portugués
Um dos principais problemas no monitoramento das estruturas de uma barragem por meio de instrumentação geodésica se refere à confirmação da estabilidade dos pontos da rede geodésica de referência. Os eventuais deslocamentos detectados nas estruturas podem ser resultados de análises e interpretações equivocadas, já que os pontos de referência podem ser considerados estáveis sem indicação dessa condição. Considerando o objetivo deste trabalho, de verificar a estabilidade dos pilares da rede geodésica da Usina Hidrelétrica de ITAIPU por meio da tecnologia GPS, foi proposta uma metodologia que compreendesse o planejamento e a coleta dos dados, realizada em quatro épocas (campanhas) distintas, seguidos do seu processamento e ajustamento. No processamento dos dados verificou-se a melhor estratégia usando a fase da portadora L1, devido às linhas de base curtas (até 5km). Já no ajustamento, constatou-se a importância da detecção de erros grosseiros nas observações das linhas de base e também do controle de qualidade. Os resultados da aplicação desta metodologia foram as coordenadas ajustadas dos pilares da rede com as suas respectivas precisões para cada época. Estas coordenadas e suas matrizes variância-covariância foram então comparadas entre combinação de campanhas com a aplicação do teste de congruência global, para a verificação final da significância estatística das diferenças encontradas. Os resultados demonstraram que as investigações da estabilidade dos pilares da rede geodésica em estudo, dependem diretamente da qualidade das observações e do ajustamento, bem como da configuração da rede geodésica.
Título en inglés
Proposal of methodology to verify the stability of the pillars of dam's geodetic monitoring network - study of case.
Palabras clave en inglés
Geodetic instruments
Geodetic networks for monitoring
Global congruency test
GPS
Monitoring of dams
Resumen en inglés
One of the main problems in dams structures monitoring by geodetic instruments is the confirmation of the stability of reference points in geodetic networks. The detection of displacements on the structures can bring results of wrong analysis just because the reference points assumed as stable points may be not. Considering the objective of this work which is to verify the stability of the pillars in ITAIPU Power Plant geodetic network by GPS, a methodology was proposed including the planning and field surveys of four campaigns in different epochs, followed by data processing and baseline adjustment. According to the results of data processing it was verified that the better strategy is process the carrier phase L1 because the baselines are short (up to 5km). Regarding the adjustment, it was confirmed the significance of observations blunders detection and quality control. The results of methodology application were the adjusted coordinates of each geodetic network pillar and the respective accuracy for each campaign. Those coordinates with its variance-covariance matrices were compared between the campaigns by means of global congruency test verifying if statistically significant differences would be found. The results demonstrated that the pillars stability of studied geodetic network is directly dependent of the observations and adjustment quality, and also of the geodetic network layout.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Dissetacao.pdf (3.69 Mbytes)
Fecha de Publicación
2010-05-20
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.