Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2006.tde-22042007-213849
Document
Auteur
Nom complet
Laherce Ribeiro de Castro Neto
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2006
Directeur
Jury
Botter, Rui Carlos (Président)
De Tomi, Giorgio Francesco Cesare
Rodrigues, Luís Henrique
Titre en portugais
Modelagem e simulação da cadeia produtiva do minério de ferro.
Mots-clés en portugais
Minério de ferro
Simulação
Sistema produtivo
Resumé en portugais
O sistema produtivo da mineração de ferro é caracterizada por um ciclo de produção longo com processo integrado em série e contínuo, desde a mina até a distribuição. Este último estágio é realizado, em grande parte, por meio do modal aquaviário. Nesse sistema dinâmico e complexo em que as operações portuárias e os processos produtivos são aleatórios, problemas logísticos podem ser identificados, acarretando custos de espera por sobreestadias de navios nos portos, traduzidos em multas, custos de manuseio e manutenção de estoques e custo de vendas perdidas pelo não-atendimento do planejamento de vendas, entre outros. Pela possibilidade da realização de experiências, da observação, da aprendizagem e da avaliação do comportamento do sistema mediante a mudança de estado das variáveis de decisão, tais como, programação da produção e nível de estoque de segurança, bem como a mudança da forma de operação, a construção de um modelo para simulação da operação desse sistema pode ser de grande utilidade na busca das possíveis soluções para maior eficiência do mesmo. O objetivo principal deste trabalho foi construir um modelo de simulação do sistema produtiva do minério de ferro que comercializa produtos acabados no mercado transoceânico e estudar o comportamento desse sistema perante mudança de estado das variáveis representadas pela seqüência de programação da produção, pelo nível de estoque de segurança no sistema e pela mudança na forma de operação. O comportamento do sistema foi avaliado por meio da análise da medida de rendimento global, definida pelo somatório dos custos de manutenção de estoques, de vendas perdidas e de multas por sobreestadia dos navios no porto no horizonte de um ano. O modelo utiliza a técnica de simulação discreta em que foi construída uma lógica para discretizar o processo produtivo, tornando possível simular o sistema contínuo sem perder a integridade dos resultados. O estudo possibilitou avaliar o "trade-off" existente entre o custo de vendas perdidas, o custo de "demurrage" e o custo de manutenção de estoques, e identificou, dentre os cenários estudados, a forma de operação para o sistema produtiva do minério de ferro que resultou no menor custo.
Titre en anglais
Iron ore supply chain: modeling and simulation.
Mots-clés en anglais
Iron ore
Productive system
Simulation
Resumé en anglais
The iron mining production system is characterized by a long production cycle with in series and continuous integrated processes, from the mine to the distribution. This last stage is largely accomplished by nautical modal. In this dynamic and complex system, which the port operations and the productive processes are aleatory, logistic problems can be identified, generating waiting expenses resulting from the ship?s overstay in the harbors, turned into fines, handling and maintenance costs and lost sales due to the sales planning non-assistance, among others. The construction of a model for operation simulation of this system can be very helpful to find possible solutions for increasing the system's efficiency. It will create the possibility of accomplishing experiments, observing, learning, and evaluating its behavior, through changing the status of the decision variables, such as production schedule and safety stock level, as well as changing the operation form. The main goal of this work was to build a simulation model of the iron ore productive system, which commercializes end products in the transoceanic market. It also allows studying the behavior of this system to face status changes of the variables represented by the production schedule sequence, safety stock level in the system and change in the operation form. The system's behavior was evaluated through the analysis of the global revenue measure from the system defined by the sum of the stocks maintenance costs, lost sales and overstay fines of ships in the harbor during a whole year. The model uses a discreet simulation technique, which logic was built to detail the productive process, making possible to simulate the continuous system without losing the integrity of the results. The study enabled to evaluate the existing trade-off between the lost sales, "demurrage" and stocks maintenance cost, and it identified, among the studied scenarios, the operation form for the iron ore productive system that resulted in lower costs.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2007-04-23
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.