• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator

Ingeniería Industrial

  
 
Resultados: Listando 10 de 438 en la página 24 de 44
Nombre
Título
Área
Documento
Facultad
Año
Heuristic model for the reverse logistics of non conform materials in the aerospace...
Niche players adaptatios to act in software ecosystems: multiple case study in B...
Heuristic methods applied to the mixed fleet vehicle routing problem with time windows,...
Fleet size and mix vehicle routing problem with time windows and scaled costs
Reaching cleaner production through lean manufacturing practices: multiple case study...
Comparative analysis of Drum-Buffer-Rope and Constant Work-in-Process models in a...
Adaptive structured approach to management andcomplex and uncertain projects' sucess...
A contribution for enhancing planning for construction projects in government owned...
Sustainability in project management and its relationship with sucess in projects:...
Process improvement in Brazilian retailer companies: case study
Resultados: Listando 10 de 438 en la página 24 de 44
Copyright © 2024 Biblioteca Digital de Teses e Dissertações da USP. Todos los derechos reservados.