• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Thèse de Doctorat
DOI
https://doi.org/10.11606/T.16.2019.tde-29072019-090623
Document
Auteur
Nom complet
Ana Beatriz de Figueiredo Oliveira
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2019
Directeur
Jury
Giacaglia, Marcelo Eduardo (Président)
Andery, Paulo Roberto Pereira
Costa, Antonio Morais Aguiar da
Fabricio, Márcio Minto
Melhado, Silvio Burrattino
Titre en portugais
Processo de produção integrado: aplicabilidade na construção industrializada
Mots-clés en portugais
BIM
Construção industrializada
Contratos relacionais
Modelagem da Informação da construção
Processo integrado
Trabalho colaborativo
Resumé en portugais
A construção industrializada se mostra como uma oportunidade para aperfeiçoar o processo de produção na construção civil, mas para sua efetiva aplicação é preciso estabelecer um processo de produção condizente com suas características. O objetivo desta pesquisa é analisar como cada uma das perspectivas da integração - contratual, organizacional e de tecnologia da informação - pode aperfeiçoar e ampliar o uso da construção industrializada. A integração do processo de produção é considerada como uma solução para aumentar a qualidade e produtividade na construção civil e suas características estão alinhados aos requisitos da industrialização, seja por meio do uso da pré-fabricação e/ou de técnicas de racionalização da construção. Na literatura afirma-se que, na construção em geral, só é possível alcançar a integração do processo com mudanças estruturais nas três perspectivas. Investigou-se, no caso da construção industrializada, se um alto nível de integração em uma ou duas dessas perspectivas pode compensar a menor ou a sua ausência em outra(s). Para tanto, criou-se um ordenamento do grau de integração relativo a cada perspectiva, pela análise em detalhe de suas características, com a ajuda de diagramas específicos. Também foi elaborada uma tabela geral, com as interdependências entre as três perspectivas dado a graduação em cada uma. Tal método serviu de base para a análise de cinco estudos de caso de construção industrializada. Observou-se que, características da integração organizacional são as que mais favorecem o uso da industrialização, estabelecendo uma visão sistêmica ao processo. É possível estabelecer o trabalho colaborativo sem que a integração esteja definida no modelo de contrato. A integração pela tecnologia da informação, especificamente por meio do BIM, ainda que não se tenha mostrado essencial, permite antecipar possíveis incompatibilidades entre os sistemas construtivos.
Titre en anglais
Integration of the building process: applicability in industrialized construction
Mots-clés en anglais
BIM
Building information modeling
Collaborative work
Industrialized construction
Integration of the building process
Relational contracts
Resumé en anglais
Industrialized construction is an opportunity to improve project delivery process; however, it is crucial to reorganize the methods of the process, for its successful use. The aim of this research is to analyze how each perspective of integration - contract, organization and information technology - can improve and expand the use of industrialized construction. Integration of the project process is assumed as a solution to increase quality and efficiency in construction and, its features are aligned with the requirements for industrialized construction, be it through prefabrication and/or rationalization of the construction. It has been stated that, for the general case in construction, its integration can only be achieved from structural changes in all three approaches. It was investigated if a high level of integration in one or two of these perspectives can compensate for lower or absent in the other(s). For that matter, an ordering of the relative degree of integration within each perspective, was derived from the analysis of their characteristics, through the use of specific diagrams. Also, a general table of the interdependencies among the three perspectives was built. This method was used to analyze five case studies of industrialized construction. It was realized that the features of organization integration are those that give better support to the use of industrialized construction. Also, that it is possible to achieve collaboration even when it is not ruled in the contracts. Integration by information technology, specifically through BIM, although not proved essential, allows for anticipation of possible incompatibilities between construction systems.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2019-08-08
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.