• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Tesis Doctoral
DOI
https://doi.org/10.11606/T.18.1999.tde-07062024-162305
Documento
Autor
Nombre completo
Marcelo Seido Nagano
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Carlos, 1999
Director
Tribunal
Moccellin, Joao Vitor (Presidente)
Belhot, Renato Vairo
Cazarini, Edson Walmir
Nakagawa, Masayuki
Ronconi, Debora Pretti
Título en portugués
Um novo método heurístico construtivo de alto desempenho para a programação de operações flow-shop permutacional
Palabras clave en portugués
métodos heurísticos
programação da produção
programação fiow-shop permutacional
Resumen en portugués
Este trabalho é direcionado ao problema de Programação de Operações Flow-Shop Permutacional. Uma propriedade do problema, oriunda de estudo sobre a sua característica, é apresentada e utilizada para o desenvolvimento de um novo método herístico construtivo, com o objetivo de minimizar a Duração Total da Programação (makespan). O novo método é comparado com o melhor heurístico construtivo reportado na literatura, conhecido por NEH. Os resultados da experimentação computacional efetuada mostram um melhor desempenho do método proposto, denominado N&M, em comparação com o NEH, para problemas com até 10 máquinas e 100 tarefas, quanto à qualidade da solução, apresentando também eficiência computacional
Título en inglés
.
Palabras clave en inglés
flow-shop sequencing
heuristics
production scheduling
Resumen en inglés
This work is addressed to the Flow-Shop Sequencing problem. As a result of an ínvestígation on the probtem characteristics it is presenteei a property of this scheduling problem, which is used for the development of a new constructive heuristic with the objective of minimizing the Total Time to complete the schedule (makespan). The new method, denoted by N&M, is compared with the best constructive heuristic reported in the literature, named NEH. Results from computational experience have shown that, for problems having up to 10 machines and 1OO jobs, the new heuristic out performs in solution quality the NEH one. There is no significant difference regarding computation effort for both NEH and N&M heuristics.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2024-06-07
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.