• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.18.2008.tde-18112008-155735
Document
Author
Full name
Graziela de Toni Aguilar
Institute/School/College
Knowledge Area
Date of Defense
Published
São Carlos, 2008
Supervisor
Committee
Ranieri, Victor Eduardo Lima (President)
Nogueira, Luiz Augusto Horta
Salvador, Nemesio Neves Batista
Title in Portuguese
Análise do tempo de tramitação de processos de licenciamento ambiental: estudo de casos de termelétricas no Estado de São Paulo
Keywords in Portuguese
Avaliação de impacto ambiental
Licenciamento ambiental
Setor energético
Termelétrica
Abstract in Portuguese
Os procedimentos de licenciamento ambiental (LA) têm sido criticados pelos agentes econômicos, notadamente por aqueles ligados ao setor energético, por entenderem que a agilidade na análise dos processos de viabilidade ambiental de empreendimentos encontra-se aquém ao esperado. Com o objetivo de analisar a interferência de alguns fatores ligados aos procedimentos de LA sobre o tempo total de tramitação dos processos, foi realizada revisão documental de processos que tramitaram no estado de São Paulo, entre 1998 e 2007, para a instalação de usinas termelétricas a gás natural, com potência superior a 10 MW, e que obtiveram a licença ambiental prévia (LP). Foram obtidos dados quantitativos e informações qualitativas que permitiram verificar que os fatores número de solicitações de informações complementares feitas pelos órgãos ambientais ao empreendedor, número de impactos ambientais identificados no estudo de impacto ambiental (EIA) e número de condicionantes constantes na LP expedida não apresentam uma relação com o tempo de tramitação dos processos. Outros fatores como deficiências no estudo ambiental e a inadequação do local proposto à instalação dos empreendimentos, dadas as restrições ambientais, aparentemente apresentam maior interferência sobre os tempos de tramitação. Diante disto, destaca-se a necessidade de, previamente ao licenciamento, serem elaborados estudos específicos voltados à apresentação de alternativas locacionais que considerem critérios ambientais e critérios econômicos com o mesmo nível de importância para a tomada de decisão. Tais estudos, servindo como base de referência para a escolha da melhor localização para instalação de empreendimentos, tendem a reduzir o tempo total de tramitação dos processos de licenciamento.
Title in English
Analysis of proceeding period on environmental licensing processes: a case study on thermal power plants in Sao Paulo state
Keywords in English
Energy sector
Environmental impact assessment
Environmental licensing
Thermal power plants
Abstract in English
The procedures for environmental licensing (LA) have been criticized by economic agents, especially by those connected to the energy sector, because they believe that agility on analysis of the processes of enterprises environmental viability is less than what was expected. In order to analyze the interference of some factors related to LA proceedings on proceeding period, the processes documentary review was held and transited in São Paulo State between 1998 and 2007 for the installation of natural gas thermal power plants with emitted preliminary environmental permit (LP) and output exceeding 10 MW. Quantitative data and qualitative information were obtained which allowed the confirmation that the factors number of requests for additional information made by environmental agencies to the enterprise, number of environmental impacts identified in the environmental impact statement (EIA) and number of constraints in the LP emitted have no relation to the proceeding period. Other factors such as shortcomings in the environmental study and inadequate the proposed site for the installation of enterprises, given the environmental restrictions, apparently show greater interference on the proceeding period. So, there is a necessity, prior to licensing, of being drawn up specific studies focused on the presentation of located alternatives to consider environmental and economic issues with the same level of importance for the decision. Such studies, serving as point of reference for choosing the best location for setting up of enterprises tend to reduce the proceeding period of the licensing processes.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2008-11-20
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.