• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.18.1996.tde-23072024-105329
Documento
Autor
Nombre completo
Regis Kengui Sucomine
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Carlos, 1996
Director
Tribunal
Resende, Marino de Oliveira (Presidente)
Belhot, Renato Vairo
Fernandes, Flavio Cesar Faria
Título en portugués
Uma proposta de estimativa e controle do lead time de manufatura
Palabras clave en portugués
gerenciamento do lead time
simulação
sistemas hierárquicos
Resumen en portugués
O gerenciamento do tempo tem sido uma das ferramentas mais poderosas para se obter uma vantagem competitiva. Quanto mais rápido nos adaptarmos as mudanças, melhores resultados obteremos. Nas empresas de fabricação sob encomenda e muito importante a habilidade de cotar preços competitivos e lead times cada vez menores. Isto implica no estabelecimento de valores realísticos na fase de consulta do cliente e o monitoramento continuo dos pedidos durante sua produção, a fim de assegurar a entrega na data estabelecida. Primeiro, uma revisão bibliográfica descritiva e realizada a respeito do lead time. Posteriormente, um método e apresentado visando a estimativa do lead time de manufatura na fase de consulta do cliente, em companhias de fabricacao sob encomenda. Na cotação de novos produtos, utiliza-se um modelo de simulação para prever os tempos de produção. Este método visa ser parte de um sistema que controlara e gerenciara o lead time de manufatura dos produtos de uma empresa
Título en inglés
A manufacturing lead time preview and control proposal
Palabras clave en inglés
backlogs
hierarchical system
lead time
lead time management
simulation
Resumen en inglés
Time management has been one of the most powerful tools to acquire a competitive advantage. The faster we change, the better results we get. In make-to-order companies the ability to quo te short lead times and competitive prices is important if they are to attract orders. This entails setting realistic values when responding to customer enquires and monitoring the progress of jobs during production, in arder to ensure that they are delivered on time. First, a descriptive bibliographical revision is made about lead time. Then, a method is presented to estimate manufacturing lead times at the customer enquiry stage in make-to-order companies. For the quotation of a new product, a simulation model is used to preview the manufacturing times. This method aims to be part of a system that will control and manage the manufacturing lead time of items in a firm.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Sucomine_Regis_ME.pdf (5.12 Mbytes)
Fecha de Publicación
2024-07-23
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.