Master's Dissertation
DOI
https://doi.org/10.11606/D.18.2009.tde-25042013-174028
Document
Author
Full name
Melissa Bellan
Institute/School/College
Knowledge Area
Date of Defense
Published
São Carlos, 2009
Supervisor
Committee
Fabricio, Márcio Minto (President)
Andery, Paulo Roberto Pereira
Novaes, Celso Carlos
Title in Portuguese
Práticas e ferramentas para coordenação de projetos de edifícios
Keywords in Portuguese
Construção civil
Coordenação de projetos
Ferramentas de apoio à coordenação de projetos
Práticas de coordenação de projetos
Projetos de edifícios
Abstract in Portuguese
O mercado da construção civil vem tendo crescimento significativo e as construtoras e incorporadoras, visando sua manutenção no mercado, vêm buscando procedimentos para produzir edifícios rapidamente, com qualidade e a um preço acessível, para suprir a demanda mercadológica. Neste contexto, nos deparamos com a coordenação de projetos de edifícios, que visa garantir ao empreendimento a sua construção no prazo, com qualidade e sem desperdícios e retrabalho, fazendo uso de um processo seriado com procedimentos padrões. Por essa razão, o presente trabalho aborda a coordenação de projetos de edifícios, seus conceitos, suas atividades, como estas são realizadas e quais ferramentais de apoio são indispensáveis à garantia dessa qualidade esperada. Objetiva-se discutir a coordenação de projeto de edifícios, mostrando sua importância e necessidade, bem como mostrar as suas melhores práticas e as suas ferramentas de apoio indispensáveis. Para a realização da pesquisa foi feita revisão bibliográfica sobre o tema e um estudo de caso realizado em duas empresas que são construtoras e incorporadoras e que possuem um departamento interno responsável pela coordenação de projetos de edifícios. Como ferramenta do estudo de caso foram utilizadas entrevistas com profissionais das empresas e com profissionais externos à empresa, que atuam na área em estudo. Nos departamentos de coordenação de projetos de edifícios das empresas estudadas, foram coletados documentos que formalizam a coordenação. Os dados coletados da empresa na prática foram confrontados com a literatura pesquisada para o embasamento da pesquisa. Com isso, foi possível mostrar, neste trabalho, as melhores práticas e suas ferramentas de apoio para coordenação de projetos de edifícios, por meio desse confronto teoria-prática.
Title in English
Practices and tools for coordination of buildings and projects
Keywords in English
Construction
Design of buildings
Practice project coordination
Project coordination
Tools support project coordination
Abstract in English
The construction market has had significant growth and builders and developers in order to maintain the market are seeking procedures to produce buildings faster and with a high quality and affordable to meet the market demand. In this context, we are faced with the coordination of building projects aimed at ensuring the development of their construction on time quality and without waste and rework through the process in series. For this reason, this paper addresses the coordination of building projects its concepts their activities as they are carried out and what kind of support tools are needed to ensure the expected quality. It aims to promote the coordination of building design, showing their importance and need, demonstrating their best practices and the tools that are essential. The study was conducted through a literature review on the subject and a case study carried out in two businesses company that are builders and developers and have an internal department responsible for the coordination of building projects. To support the case study were used interviews with business people and professionals outside the company working in the study area. In the departments of project coordination buildings of the companies studied were collected documents formalizing the coordination. The data collected from the company's practice were confronted with the literature in order to support the fundamentals of the research. Thus it was possible to demonstrate in this work, best practices and tools to support coordination of building projects, through the comparison between theory and practice.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2013-05-08
 
WARNING: The material described below relates to works resulting from this thesis or dissertation. The contents of these works are the author's responsibility.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.