Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.18.2009.tde-27052009-142518
Documento
Autor
Nome completo
Aldir Silva Sousa
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Carlos, 2009
Orientador
Banca examinadora
Asada, Eduardo Nobuhiro (Presidente)
Costa, Alysson Machado
Lázaro, Ruben Augusto Romero
Título em português
Tomada de decisão Fuzzy e busca Tabu aplicadas ao planejamento da expansão de sistemas de transmissão
Palavras-chave em português
Algoritmo heurístico construtivo
Busca Tabu
Metaheurística
Planejamento da expansão da transmissão
Tomada de decisão Fuzzy
Resumo em português
Neste trabalho é proposta uma nova técnica de solução para resolver o problema de planejamento da expansão de sistemas de transmissão estático através da introdução da tomada de decisão fuzzy. Na técnica apresentada neste trabalho, a tomada de decisão fuzzy é aplicada para o desenvolvimento de um algoritmo heurístico construtivo. O sistema fuzzy é utilizado para contornar alguns problemas críticos das heurísticas que utilizam o índice de sensibilidade como guia para inserção de novas linhas. A heurística apresentada nesse trabalho é baseada na técnica dividir para conquistar. Verificou-se que a deficiência das heurísticas construtivas é decorrente da decisão de inserir novas linhas baseada em valores não seguros encontrados através da solução do modelo utilizado. Para contornar tal deficiência, sempre que surgirem valores não seguros divide-se o problema original em dois subproblemas, um que analisa a qualidade da resposta para o caso em que a linha é inserida e outro para verificar a qualidade da resposta para o caso em que a linha não é inserida. A tomada de decisão fuzzy é utilizada para decidir sobre quando dividir o problema em dois novos subproblemas. Utilizou-se o modelo cc com a estratégia de Villasana-Garver-Salon para realizar a modelagem da rede elétrica para os problemas da expansão de sistemas de transmissão aqui propostos. Ao serem realizados testes em sistemas de pequeno, médio e grande portes certificou-se que o método pode encontrar a solução ótima de sistemas de pequeno e médio portes. Porém, a solução ótima dos sistemas de grande porte testados não foi encontrada. Para melhorar a qualidade da solução encontrada utilizou, em uma segunda fase, a metaheurística busca tabu. A busca tabu utiliza o modelo cc. Os resultados se mostraram bastante promissores. Os testes foram realizados em alguns sistemas reais brasileiros e com o sistema real colombiano.
Título em inglês
Fuzzy decision making and Tabu search applied to planning the expansion of transmission systems
Palavras-chave em inglês
Constructive heuristic algorithm
Fuzzy decision making
Heuristic
Metaheuristic
Tabu search
Transmission expansion planning
Resumo em inglês
A new solution technique to solve the long-term static transmission expansion planning (TEP) problem based on fuzzy decision making is proposed. The technique applies the concepts of fuzzy decision making in a constructive heuristic algorithm. The fuzzy system is used to circumvent some critical problems of heuristics that use sentivity indices as a guide for insertion and construction of new lines. The heuristic algorithm proposed in this work is based on the divide and conquer technique. It has been verified that the deficiency of the constructive heuristics is due to the decision of inserting new lines based only on information given by the index, which usually is calculated from a relaxed mathematical representation of the problem and can become less accurate during the solution process. In order to be able to deal with such problem, whenever the quality of the index decreases, the original problem is divided into two sub-problems: one examines the quality of the solution when the transmission line indicated by the sensitivity index is inserted and the other subproblem checks the opposite. Fuzzy decision-making is used to decide the moment to divide the problem into two subproblems based on other information. The hybrid linear model is used to model the long-term transmission expansion planning problem and is used in the proposed algorithm. Tests was done with systems of small-term, medium-term and long-term. The optimal solution of small-term and medium-term was foundo using just the construtive heuristic algorithm with fuzzy decision-making. To deal with long-term systems was used the solutions of the construtive heuristic algorithm with fuzzy decision-making to init a tabu search. The tabu search uses the dc model. The results are very promising. The test was done with some real brazilian systems and with the real colombian system.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Aldir.pdf (1.09 Mbytes)
Data de Publicação
2009-06-02
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.