• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2003.tde-04072024-114436
Document
Auteur
Nom complet
Sílvia Lêda Tôrres de Farias
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2003
Directeur
Jury
Tomi, Giorgio Francesco Cesare de (Président)
Lima, Aarão de Andrade
Soares, Lindolfo
Titre en portugais
Controle de qualidade na lavra em minas de calcário para cimento.
Mots-clés en portugais
Calcário
Controle da qualidade
Mineração (Planejamento)
Resumé en portugais
O presente trabalho trata do problema do controle de qualidade nas minas de calcário para cimento, principalmente na etapa de planejamento de curto prazo, verificando a aplicabilidade das ferramentas disponíveis no mercado. Propõe também uma metodologia para integrar as informações das diversas etapas do gerenciamento de uma mina, visando o controle de qualidade da matéria prima para a fabricação do cimento. A metodologia, bem como as ferramentas disponíveis foram testadas em empresas, apresentando resultados aceitáveis. Apesar dos resultados positivos, a pesquisa indicou que a tecnologia disponível no mercado para planejamento de curto prazo ainda é muito rígida, pouco amigável e foi projetada para uso na indústria de minerais metálicos, o que dificulta a sua aplicação em minas de calcário para cimento.
Titre en anglais
Untitled in english
Mots-clés en anglais
Limestone
Mining (Planning)
Quality control
Resumé en anglais
This research work addresses the problem of quality control in mines producing raw materials for cement, with particular focus on short term mine planning, using the latest technology available. It also proposes a methodology for integrating the various steps involved in the management of a limestone mine, with the aim of controlling the quality parameters that are relevant to the production of cement. The methodology was applied to a case study in the industry with successful results. Albeit the positive results, the research also indicated that the current software tools for short term planning do not necessarily meet all requirements of the cement industry, due to their lack of flexibility, and the fact that these tools were originally designed for metals mining.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2024-07-05
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.