• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2009.tde-11082010-164812
Documento
Autor
Nombre completo
Agenor de Faria Junior
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2009
Director
Tribunal
De Tomi, Giorgio Francesco Cesare (Presidente)
Costa, João Felipe Coimbra Leite
Sant'Agostino, Lília Mascarenhas
Título en portugués
Aprimoramento do controle de qualidade do minério no planejamento de lavra de curto prazo: estudo de caso.
Palabras clave en portugués
Amostragem de pó-de-perfuratriz
Controle de qualidade da lavra
Planejamento de lavra de curto prazo
Resumen en portugués
Melhorar o conhecimento sobre o minério lavrado é um desafio enfrentado diariamente pelas empresas de mineração. O presente trabalho trata de um estudo realizado na mina de apatita, localizada na cidade de Cajati, interior do Estado de São Paulo, de propriedade da Bunge Fertilizantes S/A, onde são abordados temas relacionados ao planejamento de lavra de curto prazo, visando o aprimoramento dos procedimentos de coleta de amostras de pó-de-perfuratriz, que são sistematicamente coletadas com o objetivo de controle de qualidade da lavra, contribuindo para uma efetiva melhoria na gestão do planejamento de lavra e na tomada de decisões. Os resultados obtidos mostram que, da forma como as amostras são coletadas, ocorre um enriquecimento do teor de P2O5, podendo levar a tomada de decisões erradas por parte da operação da mina.
Título en inglés
Improvement of the quality control of mining en the planning of short term - cause study.
Palabras clave en inglés
Dust samples drilling
Mine planning
Quality control of mining
Resumen en inglés
Improve knowledge of the ore mined is a challenge faced daily by mining companies. This paper is a study in apatite mine, located in the city of Cajati, within São Paulo,propriety of Bunge Fertilizantes S/A, where are treated issues related to short term planning of the mine to improve procedures for collecting dust samples drilling, which are systematically collected for the purpose of quality control of mining, contributing to an effective improvement in the management of planning of mining and decision making. The results show that the way the sampling is done, there is an enrichment of content in P2O5, which can lead to making wrong decisions by the operation of the mine.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2010-09-03
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.