Doctoral Thesis
DOI
https://doi.org/10.11606/T.3.2008.tde-21082009-124551
Document
Author
Full name
Fernanda Maria Pinto Freitas Ramos Ferreira
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2008
Supervisor
Committee
Francischini, Paulino Graciano (President)
Assumpção, José Francisco Pontes
Carvalho, Marly Monteiro de
Melhado, Silvio Burrattino
Pimenta, Célio
Title in Portuguese
Modelo de integração entre o projeto executivo e o planejamento operacional em empreendimentos de edificações comerciais.
Keywords in Portuguese
Administração de projetos
Construção civil
Gerenciamento da construção
Abstract in Portuguese
Esta pesquisa apresenta um modelo de integração entre o projeto executivo e o planejamento operacional de empreendimentos comerciais, aplicado em 8 empresas (2 construtoras, 1 incorporadora, 3 consultorias de gerenciamentos de projetos, 1 empreiteiro e 1 empresa de projetos). A contribuição do modelo beneficia o processo de integração em 6 processos do planejamento de um projeto, a saber: (a) na criação da EAP (estrutura analítica do projeto); (b) na definição de atividade; (c) no seqüenciamento de atividades; (d) na estimativa de recursos da atividade; (e) na estimativa de duração da atividade e (f) no desenvolvimento do cronograma. Entre as principais conclusões, percebemos que a aplicação do modelo é possível pelo aumento da rapidez na preparação do cronograma do projeto e na simulação de tomada de decisões operacionais, mas desde que às empresas do setor consolidem as práticas de coordenar, projetar e gerenciar de forma simultânea e consistente; criando seu próprio banco de dados de tecnologias construtivas, integrado aos sistemas informatizados de projetos e de gerenciamento.
Title in English
Integration model between the design and the operational planning in enterprises of commercial constructions.
Keywords in English
Administration of design
Civil construction
Construction management
Abstract in English
This research presents an integration model between the design and the operational planning of commercial enterprises, applied in 8 companies (2 builders, 1 company of incorporation, 3 consultancies of project management, 1 contractor and 1 company of projects). The contribution of the model benefits the integration in 6 processes of the planning of an enterprise, to know: (a) create WBS (work breakdown structure); (b) activity definition; (c) activity sequencing; (d) activity resource estimating; (e) activity duration estimating and (f) schedule development. Among the main conclusions, we noticed that the application of the model is possible for the increase of the speed in the preparation of the shedule of the enterprise and in the simulation of operational decisions, but since to the companies of the section consolidate the practices of coordinating, to design and to manage in a simultaneous and solid way; creating the own database of constructive technologies, integrated into the computerized systems of design and of management.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2009-10-08
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.