• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2014.tde-22052015-155307
Document
Auteur
Nom complet
Leonardo Gurgel Cálipo
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2014
Directeur
Jury
Mesquita, Marco Aurélio de (Président)
Biazzi, Jorge Luiz de
Ronconi, Debora Pretti
Titre en portugais
Análise do problema de controle de estoques dinâmico para demanda não estacionária e lead-time positivo.
Mots-clés en portugais
Controle de estoques
Demanda não-estacionária
Heurística
Programação dinâmica
Simulação
Resumé en portugais
O problema de controle de estoques com demanda não estacionária e lead-time positivo tem se tornado cada vez mais relevante em virtude da crescente tendência de redução do ciclo de vida dos produtos e internacionalização das cadeias de suprimentos. Embora haja uma solução exata para a minimização do custo esperado da política de estoques para este cenário, baseado no método de programação dinâmica, o custo computacional deste método ainda é considerado elevado. Este trabalho detalha e avalia através de simulação o método exato e duas aproximações para a minimização do custo esperado da política de estoques, em termos do desempenho em custo e eficiência computacional. Os resultados experimentais permitem a análise dos métodos disponíveis. Enquanto a abordagem heurística de Bollapragada e Morton, que utiliza o nivelamento da demanda não estacionária, perde desempenho de custo com o aumento do lead-time, a nova heurística proposta, que aproxima os parâmetros da política ótima por valores limitantes, produz resultados sucessivamente melhores com o aumento do lead-time.
Titre en anglais
Analysis of the dynamic inventory control problem with nonstationary demand and positive lead-time.
Mots-clés en anglais
Dynamic programming
Heuristic
Inventory control
Non-stationary demand
Simulation
Resumé en anglais
The inventory control problem with nonstationary demand and positive lead-time has become increasingly important due to the growing trend of reduction in product life cycle and internationalization of the supply chain. Although there is an exact solution to the minimization of the expected cost of inventory policy on this environment, through the method of dynamic programming, the computational cost of this method is still considered high. This work details and evaluates through simulation the exact method and two heuristic solutions for the minimization of expected cost of inventory policy, in terms of cost performance and computational efficiency. The experimental results allow the analysis of the available methods. While the Bollapragada and Morton heuristic approach, which levels the non-stationary demand, decreases the cost performance when lead-time is increased, the new heuristic proposed, that approximates the optimal policy parameters by limiting values, successively produces better results with increasing lead-times.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
ERRATA.pdf (37.19 Kbytes)
FichaCatalografica.pdf (13.67 Kbytes)
Date de Publication
2015-05-27
 
AVERTISSEMENT: Le matériau se réfère à des documents provenant de cette thèse ou mémoire. Le contenu de ces documents est la responsabilité de l'auteur de la thèse ou mémoire.
  • CÁLIPO, L. G., e MESQUITA, M. A. Planejamento e Controle de Separação em um Sistema Picking by Monitor: um estudo em uma empresa de cosméticos. In XXXII Encontro Nacional de Engenharia de Produção, Bento Gonçalves - RS, 2012. Anais do XXXII Encontro Nacional de Engenharia de Produção., 2012.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.