Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2016.tde-24062016-151136
Document
Author
Full name
Naira Ery Asano
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2016
Supervisor
Committee
Barros, Mercia Maria Semensato Bottura de (President)
Franco, Luiz Sergio
Masuero, Angela Borges
Title in Portuguese
Tecnologia construtiva de revestimento externo de argamassa com projeção contínua.
Keywords in Portuguese
Argamassa
Desempenho de materiais de construção
Projeção
Racionalização da construção
Revestimento
Abstract in Portuguese
Os métodos construtivos de revestimento externo produzidos com argamassa vêm evoluindo ao longo do tempo, apresentando como maior mudança a substituição da aplicação manual pela projeção mecânica. Atualmente destaca-se no mercado o sistema de execução de revestimento externo com argamassa industrializada e projeção mecânica contínua com bombas helicoidais. Por se tratar de uma tecnologia ainda não muito utilizada pelas construtoras brasileiras, faltam dados confiáveis acerca de seu potencial de ganho de produtividade, redução de perdas, diminuição de contingente de mão de obra, exigências de infraestrutura para aplicação e custos envolvidos. Sem parâmetros confiáveis, adotar a tecnologia significa assumir um nível de risco elevado e isto dificulta a tomada de decisão por parte das construtoras e, por consequência, dificulta-se a evolução tecnológica. Buscando contribuir para o necessário avanço nas tecnologias de produção de revestimentos de edifícios, o objetivo desta pesquisa é estabelecer parâmetros em relação à tecnologia de produção de revestimentos de fachada que empregam argamassa com projeção contínua. Para tanto, buscou-se informações em referências como teses, dissertações, textos técnicos, normas nacionais, dentre outras, bem como, acompanhou-se e avaliou-se os resultados da implantação de um método construtivo de revestimento de argamassa com projeção mecânica contínua em uma construtora de São Paulo. Foram realizados um protótipo e um piloto que contribuíram para o desenvolvimento da tecnologia por meio de apresentação de soluções para os problemas encontrados, do levantamento de melhores práticas e de dados para o cálculo de índices de produtividade e perda. Buscou-se, portanto, a consolidação da tecnologia de projeção contínua na construtora anteriormente mencionada e no mercado em geral.
Title in English
Outer rendering constructive technology with mortar and continuous projection.
Keywords in English
Mortar
Performance of construction materials
Projection
Rationalization of construction
Rendering
Abstract in English
The external rendering constructive methods produced with mortar have evolved over time and the greater change in it was the replacement of manual application by mechanical projection. The currently most prominent system in the market is the outer rendering execution system with industrialized mortar and continuous mechanical projection with helical pumps. Since this technology is not widely used by Brazilian construction companies, there is a lack of reliable data regarding its productivity gain potential, loss reduction, reduction of hand quota of work, infrastructure required for application and costs involved. Without reliable parameters, the decision to implement this technology is highly risky which does not encourage constructions companies to decide to apply it and, therefore, makes its technological evolution harder to be achieved. Aiming to contribute to the necessary advancement in technology for the production of rendering, this research has the objective to establish parameters to the rendering technology that uses industrialized mortar with continuous projection. With this purpose, it was used as source and reference the specialized literature such as thesis, dissertations and scientific papers, as well as both national norms. In addition, the research included the monitoring and assessment of the results from the implementation of a rendering execution method with continuous mechanical projection in a construction company in Sao Paulo. A prototype and a pilot scale were built and they contributed to the development of this technology by presenting solutions for problems identified and through the mapping of best practices and gathering data that allowed the calculation of productivity and loss rates. The goal was, thus, to consolidate the continuous projection technology in the above-mentioned construction company as well as in the market in a broader way.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2016-06-27
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.