• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Thèse de Doctorat
DOI
https://doi.org/10.11606/T.55.2012.tde-30112012-142043
Document
Auteur
Nom complet
Victor Claudio Bento de Camargo
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2012
Directeur
Jury
Toledo, Franklina Maria Bragion de (Président)
Clark, Alistair Richard
Lobo, Bernardo Sobrinho Simões de Almada
Oliveira, José Fernando da Costa
Ronconi, Debora Pretti
Titre en portugais
Otimização de processos na indústria têxtil: modelos e métodos de solução
Mots-clés en portugais
Dimensionameto e sequenciamento de lotes
Indústria têxtil
Matheurística
Planejamento da produção
Programação inteira mista
Resumé en portugais
As decisões operacionais de produção em uma indústria de fiação são planejadas na prática determinando soluções dos sub-problemas de dimensionamento e sequenciamento de lotes e da mistura de fardos de algodão. As tarefas são: definir o tamanho, a sequência, o tempo e alocação de cada lote de produção e quais fardos de algodão devem ser utilizados na produção. Por si só, os sub-problemas representam grandes desafios no planejamento da produção. Entretanto, para melhor representar o ambiente produtivo e alcançar custos de produção mais baixos, indústrias de processo, como as de fiação, procuram integrar mais e mais seus sub-problemas de planejamento. O objetivo dessa tese é apresentar modelos matemáticos e métodos de solução para auxiliar a tomada de decisão no nível operacional do planejamento da produção. Três formulações matemáticas para o dimensionamento e sequenciamento de lotes em um sistema de dois estágios com produção sincronizada são propostas. Um novo método baseado em programação matemática e metaheurísticas e também desenvolvida para a solucão desse sub-problema. Além disso, a integração das decisões relativas a matéria-prima (fardos de algodão) ao dimensionamento e sequenciamento de lotes é analisada. As novas formulações propostas representam de forma mais realista o problema de dimensionamento e sequenciamento de lotes da indústria de fiação e de indústrias de processo com ambiente produtivo similares. O método de solução encontra boas soluções para o problema e supera outros méodos similares presentes em softwares comerciais. Além disso, o método é geral o suficiente para a solução de outros problemas de otimização. O problema integrado de dimensionamento e sequenciamento de lotes e mistura comprovou que restrições relativas à qualidade dos fios influenciam os custos e viabilidade do planejamento da produção. O planejamento integrado dessas óperações trata o sistema considerando restrições que se relacionam, definindo planos de produção mais realistas
Titre en anglais
Optimization of processes in textile industry: models and solution methods
Mots-clés en anglais
Lot-sizing and scheduling
Matheuristic
Mixed integer programming
Production planning
Textile industry
Resumé en anglais
In the practice of a spinning industry, the operational decisions of the production planning are determined by the hierarchical solution of the lot-sizing and scheduling problem and the blending problem of the cotton bales. The tasks are: to define the size, sequence, timing and allocation of each production lot and to select which cotton bales are used for production. Each of these problems represents a large challenge in planning the production. However, in order to better represent the production environment and to reach lower production costs, process industries (as the spinning industry) are integrating more and more of the production sub-problems into the planning. The aim of this thesis is to propose novel mathematical models and solution methods to assist the decision maker to plan the production at the operational level. Three formulations for the synchronized two-stage lot sizing and scheduling are proposed. A new method based on mathematical programming and metaheuristics is also developed to solve this sub-problem. In addition, the integration of the lot sizing and scheduling with decisions related to the raw materials (cotton bales) is analyzed. The novel models represent a more realistic lot sizing and scheduling for the spinning industry and process industries of similar production environment. The solution method finds good solutions to the mentioned problem and outperforms other state-of-the-art methods incorporated in commercial softwares. Moreover, the method is general enough to solve other optimization problems. The integrated lot-sizing, scheduling and blending prove that constraints related to the yarn quality influence the costs and the feasibility of the production planning. The integrated planning of these operations approaches the system considering the constraint relationship and defines more realistic production plans
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
victorrev.pdf (2.68 Mbytes)
Date de Publication
2012-12-05
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.