• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Doctoral Thesis
DOI
https://doi.org/10.11606/T.18.1999.tde-11062024-110818
Document
Author
Full name
Helenilza Ferreira Albuquerque Cunha
Institute/School/College
Knowledge Area
Date of Defense
Published
São Carlos, 1999
Supervisor
Committee
Calijuri, Maria do Carmo (President)
Chaudhry, Fazal Hussain
Nordi, Nivaldo
Salati, Eneida
Vazoller, Rosana Filomena
Title in Portuguese
Avaliação da eficácia de medida mitigatória de impactos sócio-ambientais causados por construção de hidrelétricas : o reassentamento populacional de UHE de Taquaruçu-SP
Keywords in Portuguese
condições de vida
impactos sócio-ambientais
medidas mitigadoras
reassentamento populacional involuntário
usinas hidrelétricas
Abstract in Portuguese
A Companhia Energética de São Paulo (CESP) construiu no período de 1980 e 1992 a barragem de Taquaruçu para geração de energia elétrica. A barragem foi edificada no Rio Paranapanema, entre os municípios de Sandovalina (SP) e Itaguagé (PR),formando um lago de 105,5 km por metro quadrado. Houve a necessidade de um programa de reassentamento de pequenos produtores rurais que habitavam as regiões ribeirinhas que seriam alagadas. No escopo do EIA/RIMA da obra a ser executada foramprevistas medidas mitigadoras dos impactos sócio-ambientais. Esta pesquisa apresenta uma avaliação da eficácia dessas medidas na minimização dos impactos sócio-ambientais causados pela construção da Usina Hidrelétrica (UHE) de Taquaruçu.Primeiramente foi realizada uma avaliação em campo das condições de vida da população reassentada em 1992, estabelecendo um paralelo entre a situação sócio-ambiental anterior e posterior ao reassentamento Fazenda Laranjeiras no Município deNarandiba (SP), no intuito de identificar os impactos causados pela obra. Os dados obtidos pela investigação de campo receberam tratamento estatísco. Paralelamente foi feita uma análise descritiva de projetos anteriores de reassentamentos daCESP tais como Lagoa São Paulo (1978) e Rosanela (1986). Os resultados obtidos pelas análises, estatistica e descritiva, indicaram a diminuição da satisfação da população, principalmente com a infra-estrutura do reassentamento. No reassentamentode Laranjeiras as carências mais observadas foram no sistema de transporte e nos serviços de saúde. Há ncessidade de se trabalhar com maior ênfase as variáveis sociais específicas desses projetos, que geralmente não são consideradas, a fim de melhor atender aos interesses e particularidades das populações reassentadas
Title in English
Evaluation of socioenvironmental mitigation measures caused by the construction of hydropower plants : the populational resettlement of the Taquaruçu power plant, São Paulo, Brazil
Keywords in English
hydropower
negative effects mitigatíon
population living conditions
populational involuntary resettlement
socio-environmental impact
Abstract in English
The Electricity Company of São Paulo (CESP), Brazil, constructed from 1980 to 1992 the Taquamçu Dam for the generation of hydropower. Forming a reservoir of 105,5 km , the dam was built on the Paranapanema River between the municipalities of Sandovalina (SP) and Itaguagé (PR). A program for the resettlement of a small group of rural producers which lived on the flooded área was necessary. hi the Environmental Impact Study and in the Environmental Impacts Report of the dam, mitigation measures on the socioenvironmental ímpacts were proposed. This research presents an evaluation ofthe efficiency ofthese measures on minimizing the socioenvironmental impacts caused by the construction of the Taquaruçu Power Plant. FÍrstly an evaluation of the population living conditions was conducted establishing a comparison between the population s socioenvironmental situation before and after the resettlement 'Tazenda Laranjeiras" (1992), in the municipality of Narandiba (SP). The obtained data during the field investigation received statístical treatment. Simultaneously, previous CESP resettlement projects as Lagoa São Paulo (1978) and Rosanela (1986) were described. The results of the statistícal and descriptive analysis indicated a diminishment of population7s satisfaction, specially with the infrastructure in the resettlement area. In the Laranjeiras Resettlement the main needs observed were in the transportation system and in the health service. It is necessary to emphasize specific social variables in this kind of projects, which are generaly not considered, to better attend the interests and particular needs of resettled populations
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2024-06-11
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.