• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.18.2000.tde-28052024-114926
Document
Author
Full name
Sami Antonio Tauk
Institute/School/College
Knowledge Area
Date of Defense
Published
São Carlos, 2000
Supervisor
Committee
Sacomano, Jose Benedito (President)
Guerrini, Fabio Muller
Silva, Laercio Ferreira e
Title in Portuguese
O plano do processo produtivo para empresas do subsetor de edifícios da construção civil
Keywords in Portuguese
construção civil
engenharia de produção
gerenciamento da construção
sistemas e processos construtivos
Abstract in Portuguese
A construção civil brasileira, em particular o subsetor de edificiações, está passando por mudanças paradigmáticas em busa da competitividade. Um Sistema de Administração de Produção utilizado no setor metalemecânico, embasado nas estratégias damanufatura e aplicado a construção civil, permite que o setor torne-se mais competitivo. O plano do processo Produtivo, parte do Sistema de Adminsitração de Produção para empresas de pequeno e médio porte de construção civil (SAP-C), criapadrões de competitividade para o subsetor de edificações, pois desenvolve-se em relação às vantagens competitivas: custo, qualidade, flexibilidade, confiabilidade e gestão de suprimentos
Title in English
O plano do processo produtivo para empresas do subsetor de edifícios da construção civil
Keywords in English
civil construction
construction management
construction systems and processes
production engineering
Abstract in English
The Civil Engineering works sector in Brazil, particularly the building construction subsector has been undergoing paradigmatical changes in its search for competitivy. A production administration system used in the metalmechanic sector, based on manufacture strategies and applied to the construction business makes it possible for the sector to beco me more competitive. The productive process plan, which is part of the production administration system for small and medium construction enterprises, establishes competitivity standards for the construction subsector, as it grows in relation to the competitive advantages: cost, quality, flexibility, reliability and management of supplies.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2024-05-28
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.